contactse-newsrepresentative officeslanguages
for partnersvisiting Sloveniainteractive mapLiving with the port
search
Home / Terminals and Cargo / European Energy Terminal
Terminals and Cargo
Container and Ro-Ro Terminal Car Terminal General Cargo Terminal Fruit Terminal Timber Terminal Terminal for Minerals Terminal for Cereals and Fodder Alumina Terminal European Energy Terminal Liquid Cargoes Terminal Livestock Terminal Passenger terminal
Ships alongside:
ALEMANIA (03.02 - 04:00)
MSC BASEL (03.02 - 00:00)
ILHAN AGA (01.02 - 06:00)
BELGIAN REEFER (31.01 - 23:59)
ASTRA (31.01 - 21:00)
LEPTIS STAR (31.01 - 00:00)
LETFALLAH V (30.01 - 10:00)
LUCKY NED (30.01 - 02:00)
Arriving vessels, Pilotage plan, Ships alongside
SITL
 
  European Energy Terminal

"On the way to energy"

At the European Energy Terminal we handle and warehouse coal and iron ore.
The terminal equipment enables the loading and discharging of cargo to/from all means of transport (wagon, truck, barge / ship).

Terminal in numbers

Capacity and equipment
Operative shore  630 m
Berths 3
Max. arrival draught   17.20 m
No restriction till arrival draught   16.50 m
Gantry crane 15 tons   1
Bridge crane 32 tons  3
Unloading (daily capacity) 
Coal (handy size) 8,000 - 12,000 tons
Coal (cape size vessel) 17,000 tons
Coal (panamax vessel)  15,000 tons
Iron ore (cape size vessel) 25,000 tons
Loading (daily capacity)
Coal (handy size vessel)  10,000 tons
Coal (barge) 10,000 tons
Storage capacity   
Coal  500,000 tons
Iron ore  300,000 tons
Stock equipment    
Coal  stacker - reclaimer
Iron ore  stacker - reclaimer

Additional services: blending, crushing, screening.

Terminal and environment

The terminal is located close to urban areas. For that reason we at Luka Koper d.d. devote special attention to the environmental aspects of terminal operation.  
In order to limit the negative influence of terminal operations, particularly the dust, we have introduced the following measures:

  • computer-controlled closed conveyor system for unloading of ships,
  • ship loader is equipped with an anti-dust telescopic tube,
  • we have set up a system of sprinkling towers and an aluminium barrier (11 metres) around the terminal,
  • sprinkling devices on the handling equipment,
  • cleaning the transport path around the terminal twice a day,
  • the technological water is collected, treated and re-used.


 
Photogallery
Panoramic photo
Contact
Bojan Tomišič Head of PC European Energy Terminal Phone:
+386 5 66 56 705
Fax:
+386 5 63 95 027
E-mail
Links
Contacts Lunaris
European Energy terminal
top